Channel Letters Being Installed in Verona, PA
Scott Kelsey, Signs of Excellence, about 15 feet up in the air installing a non-raceway channel letter sign for a new medical center in Verona, PA.
With this type of sign each letter is mounted with 4 to 6 studs drilled into the building wall. This installation required about 30 hours to complete with over 60 mounting holes though 12 inches of brick wall.
The business owners were very happy to have this sign in operation for the first day of business and beyond. We wish them well in their new adventure.